Industrial generators serve mines, manufacturing plants, cold-chain hubs and utilities where downtime destroys margin. The AGP industrial band focuses on 100 kVA to 500 kVA three-phase diesels with Perkins, Cummins and Baudouin power dens. Project pricing commonly ranges from R198,500 for a 100 kVA silent Perkins to R845,000 excl. VAT for a 500 kVA open industrial set, excluding civils and MV/LV integration.
Sizes this category covers: 100 kVA generators, 150 kVA generators, 200 kVA generators, 250 kVA generators, 300 kVA generators, 400 kVA generators, 500 kVA generators and 750 kVA generators.
29 generators
29 generators
250 kVA Three Phase Silent Diesel Generator
Lead time 4 weeks
R 412 000
Excl. VAT
500 kVA Three Phase Silent Diesel Generator
Lead time 8 weeks
R 845 000
Excl. VAT
1000 kVA Three Phase Silent Diesel Generator
Lead time 14 weeks
R 1 637 000
Excl. VAT
100 kVA Three Phase Open Frame Diesel Generator
Lead time 3 weeks
R 172 000
Excl. VAT
150 kVA Three Phase Silent Diesel Generator
Lead time 3 weeks
R 290 900
Excl. VAT
150 kVA Three Phase Prime Power Silent Diesel Generator
Lead time 5 weeks
R 312 000
Excl. VAT
180 kVA Three Phase Silent Diesel Generator
Lead time 4 weeks
R 340 600
Excl. VAT
220 kVA Three Phase Silent Diesel Generator
Lead time 4 weeks
R 402 200
Excl. VAT
250 kVA Three Phase Open Frame Diesel Generator
Lead time 6 weeks
R 358 000
Excl. VAT
250 kVA Three Phase Prime Power Silent Diesel Generator
Lead time 6 weeks
R 445 000
Excl. VAT
300 kVA Three Phase Silent Diesel Generator
Lead time 5 weeks
R 510 000
Excl. VAT
320 kVA Three Phase Silent Diesel Generator
Lead time 6 weeks
R 543 700
Excl. VAT
350 kVA Three Phase Silent Diesel Generator
Lead time 8 weeks
R 594 100
Excl. VAT
400 kVA Three Phase Silent Diesel Generator
Lead time 6 weeks
R 678 000
Excl. VAT
450 kVA Three Phase Silent Diesel Generator
Lead time 8 weeks
R 761 600
Excl. VAT
Industrial generator projects that survive first principles
Industrial power fails in the interfaces: wrong breaker coordination, undersized neutral, ignored harmonic loads from VSDs, missing step-load capability for large motors, or fuel systems that cannot keep up with 24-hour duty. Start with a measured or engineered load list, motor schedule and single-line diagram. Only then select engine, alternator pitch, controller and enclosure.
Procurement packs matter. Mines and corporates need datasheets, drawings, ITPs, spares lists, training matrices and BBBEE documentation. AGP Generators structures quotations for tender evaluation, not only for a WhatsApp price. Lead times should include factory tests, transport permits for abnormal loads, and site access windows.
Enclosures follow the environment: silent canopies near admin blocks, open sets in ventilated plant rooms, containerised modules for remote pits, and weather protection for coastal corrosion. Exhaust routing, fire suppression interfaces and bunding must satisfy both OEM and site HSE rules.
After energisation, reliability is a maintenance system. Oil analysis trends, thermal scans on terminations, coolant chemistry and firmware backups prevent the “mystery trip” that halts a shift. We can embed service level agreements with spares holding so mean time to repair stays contractual, not hopeful.
Related guidance: 100 kVA generators, 250 kVA generators, 500 kVA generators, prime power generators, three phase generators and generator running costs guide.
Industrial Generators in South Africa FAQs
In AGP’s catalogue framing, industrial usually begins around 100 kVA continuous commercial duty and extends through multi-hundred kVA plant sets.
Yes — container and canopy packages are quoted against site access, acoustic and environmental constraints.
Grid-parallel and peak-shave schemes are engineered case by case with protection studies. Island-only standby is the simpler default.
Load list or maximum demand, motor sizes, voltage, site altitude, ambient, fuel preference, acoustic limits and whether installation is in scope.
Both appear on industrial projects; acceptance depends on site standards, parts strategy and consultant specifications. We align to the specification.
By appropriate heavy transport with lifting plans. Abnormal load escorts may apply above certain dimensions — flagged early in project planning.