Fixed generator installations in South Africa must comply with SANS 10142-1. A registered person issues a Certificate of Compliance after correct changeover, earthing, cable sizing and labelling. Insurers increasingly ask for the CoC after a claim. Portable sets used as temporary supply still need safe isolation practices — never back-feed a DB without a changeover.
Why this decision matters
Fixed generator installations in South Africa must comply with SANS 10142-1. A registered person issues a Certificate of Compliance after correct changeover, earthing, cable sizing and labelling. Insurers increasingly ask for the CoC after a claim. Portable sets used as temporary supply still need safe isolation practices — never back-feed a DB without a changeover. Buyers who skip structured sizing or compliance checks pay twice: once for the wrong unit, and again for downtime, fuel waste or a failed insurance claim.
AGP Generators engineers treat every enquiry as a load and site problem first, a product second. The notes below are the same framework we use on commercial RFQs across South Africa and SADC.
Practical method
Step-by-step
Start with a written load list: running watts, starting watts, duty cycle and which loads are truly critical. Convert watts to kVA using power factor (0.8 is the commercial default unless you know otherwise).
Apply site factors next — altitude derate, ambient temperature, fuel quality and whether the set will see prime hours or true standby. Only then shortlist engine brands and canopy types.
Validate with our Sizing calculator and a specialist review before you issue a purchase order. Catalogue pages for the 60 kVA Perkins prime and 22 kVA single-phase silent show real price bands excl. VAT to sanity-check budgets.
- Record running and starting loads separately for motors and compressors.
- Separate essential vs shedable circuits so you do not oversize the set.
- Confirm phase (single vs three) against the DB and utility supply.
- Document who owns installation, CoC and first service.
Reference data
Use the table as an indicative planning aid, not a substitute for a site assessment. Prices and fuel figures move with diesel wholesale rates and exchange rates — we re-verify commercial quotes at order stage. Last updated 2026-08-10.
Common mistakes
Copying the kVA of a failed set without measuring today’s load. Ignoring motor starting. Buying open-frame units for estate boundaries. Skipping changeover and earthing design. Assuming “silent” means inaudible indoors.
How AGP helps
We size, supply, install and maintain diesel and petrol generators from 2.2 kVA to 1000+ kVA. Request a quote with your load list, or call +27 41 007 0618. For hybrid and long-hour sites, ask about diesel-solar controllers that keep engines in an efficient band.
Data table
Compliance checklist for fixed installations
| Item | Required | Owner | Evidence |
|---|---|---|---|
| Changeover / interlocking | Yes | Installer | As-built + CoC |
| Earthing & bonding | Yes | Installer | Test results |
| Cable sizing | Yes | Installer | Calc sheet |
| Labelling & notices | Yes | Installer | Photos |
| CoC issue | Yes | Registered person | CoC number |
Figures are indicative. Last updated 10 August 2026.
Frequently asked questions
Is a CoC legally required?
Fixed electrical installations require compliance; the CoC is the standard proof after work by a registered person.
Does a portable generator need a CoC?
The temporary connection method still must be safe; permanent wiring changes need proper certification.
Who issues the CoC?
A registered person as defined under the Electrical Installation Regulations.
Will insurance pay without a CoC?
Many policies expect proof of compliant installation after generator-related claims — ask your broker.
Does AMF equipment change the rules?
Automatic changeover must still meet isolation and interlocking requirements in SANS 10142-1.
Related tools: Sizing calculator · All insights
Related sizes, categories and services: 60 kVA generators, petrol generators and single phase generators.
Get power insights by email
Sizing guides, compliance notes and running-cost updates. Unsubscribe any time — POPIA compliant.